Scope
A five-month, base-wide build: duct bank, 850,000 feet of fiber, and 11,000 fibers terminated and tested, with inside plant work in 227 buildings.
Work performed
- 283,900 ft of duct bank
- 850,000 ft of fiber optic cable
- 94 manholes and handholes
- 15,500 ft of boring
- 58,200 ft of MaxCell innerduct
- 11,000 fibers terminated and tested
- Inside plant work in 227 buildings
- GPS survey