JBLM Miller Hill Infrastructure Improvements

Joint Base Lewis-McChord, WA · Jan 2013 – May 2013

Scope

Concrete duct bank, precast manholes and fiber feeds for new barracks, with a detailed cutover plan and test results for every new cable.

Work performed

  • 3,295 ft of concrete duct bank trenched and backfilled, part of it joint with power
  • 9 precast concrete manholes with locking lids
  • 39,540 ft of 4-inch PVC conduit and 34,103 ft of MaxCell
  • 1,200 ft of aerial 12-count fiber for a two-building cutover
  • 1,550 ft of 24-count single-mode fiber to a new barracks
  • Cutover plan and test results for all new cable