Scope
Concrete duct bank, precast manholes and fiber feeds for new barracks, with a detailed cutover plan and test results for every new cable.
Work performed
- 3,295 ft of concrete duct bank trenched and backfilled, part of it joint with power
- 9 precast concrete manholes with locking lids
- 39,540 ft of 4-inch PVC conduit and 34,103 ft of MaxCell
- 1,200 ft of aerial 12-count fiber for a two-building cutover
- 1,550 ft of 24-count single-mode fiber to a new barracks
- Cutover plan and test results for all new cable