JBLM Pendleton Avenue Power and Communication Improvements

Joint Base Lewis-McChord, WA · Jul 2011 – Mar 2012

Scope

Primary and secondary power and communication duct banks, maintenance holes and transformer vaults along Pendleton Avenue at Joint Base Lewis-McChord.

Work performed

  • 7,500 ft of 4-inch and 5-inch primary duct bank and 200 ft of secondary
  • 6,500 ft of 12-way 4-inch duct bank
  • 44 maintenance holes and a hand hole
  • A switch vault and 9 transformer vaults
  • Locking lids and pans on 45 vaults
  • 21,000 ft of MaxCell innerduct
  • Tree removal along the duct alignment