Scope
Primary and secondary power and communication duct banks, maintenance holes and transformer vaults along Pendleton Avenue at Joint Base Lewis-McChord.
Work performed
- 7,500 ft of 4-inch and 5-inch primary duct bank and 200 ft of secondary
- 6,500 ft of 12-way 4-inch duct bank
- 44 maintenance holes and a hand hole
- A switch vault and 9 transformer vaults
- Locking lids and pans on 45 vaults
- 21,000 ft of MaxCell innerduct
- Tree removal along the duct alignment