Scope
A fully compliant outside plant and inside plant distribution system for a base-wide infrastructure upgrade: new backbone fiber to 27 buildings, communication closet build-outs, duct bank, vaults and site restoration.
Work performed
- Fiber installed, spliced, tested and terminated to 27 buildings
- Communication closets built out with new racks and switches
- 18,400 ft of 4-way and 6-way duct bank
- 20 communication vaults and 3 manhole overbuilds
- 65,000 ft of fiber and 32,000 ft of MaxCell
- 12 utility poles replaced
- 15,000 ft of existing duct bank removed
- Clearing, grading, and asphalt and concrete restoration