Fort Jackson Duct Bank, Fiber and Continuity Upgrades

Fort Jackson, SC · Apr 2010 – Jul 2013

Scope

Duct bank, fiber and inside plant work in 51 buildings at Fort Jackson, plus generator replacement and UPS installation at the base's central office.

Work performed

  • 50,300 ft of duct bank
  • 32 manholes and handholes
  • 2,500 ft of boring
  • 145,000 ft of fiber optic cable
  • 2,292 fibers terminated and tested
  • Inside plant work in 51 buildings
  • Generator replacement and UPS installation