Scope
Duct bank, fiber and inside plant work in 51 buildings at Fort Jackson, plus generator replacement and UPS installation at the base's central office.
Work performed
- 50,300 ft of duct bank
- 32 manholes and handholes
- 2,500 ft of boring
- 145,000 ft of fiber optic cable
- 2,292 fibers terminated and tested
- Inside plant work in 51 buildings
- Generator replacement and UPS installation