Scope
Inside and outside plant construction across Fort Lewis: new EMT, cable tray and innerduct pathway in more than 300 buildings, plus duct bank, manholes and rock-sawed fiber at Yakima Training Center.
Work performed
- New pathway (EMT, cable tray, pliable innerduct) in 300+ buildings
- More than 115 manholes
- 174,000 ft of duct bank
- 375,000 ft of fiber cable
- 130,000 ft of rock sawing for fiber at Yakima Training Center
- 7,200 fiber terminations