Scope
Sub-arctic duct bank, vaults, copper and fiber plant at Fort Greely, Alaska, including 17,800 copper pair splices and inside plant work in 51 buildings.
Work performed
- 17,750 ft of duct bank
- 11 vaults
- 12,500 ft of copper cable
- 6,105 ft of fiber cabling and 7,400 ft of fiber optic cable
- 17,800 copper cable pairs spliced
- Inside plant work in 51 buildings