Scope
More than 100 miles of duct bank and nearly a million feet of cable placed across Edwards Air Force Base, with inside plant work in 215 buildings.
Work performed
- 564,000 ft of duct bank
- 966,000 ft of cable placed
- 167 manholes and handholes
- 9,459 ft of boring
- 240,250 ft of MaxCell innerduct
- Inside plant work in 215 buildings