Cheyenne Air National Guard Duct and Fiber System

Cheyenne, WY · Apr 2009 – Oct 2009

Scope

GPS-surveyed duct system, manholes and fiber for the Air National Guard base at Cheyenne, with inside plant pathway, FODPs, racks and cabinets in 18 buildings.

Work performed

  • GPS survey of all new construction
  • 24 manholes excavated and installed
  • 7,800 ft of 4-inch duct system trenched and 3,800 ft directionally bored
  • 36,000 ft of MaxCell innerduct
  • 38,500 ft of fiber optic cable
  • More than 1,600 fiber strands terminated
  • Inside plant work in 18 buildings

Got a Similar Project?

Tell Marty about the installation, scope and timeline. He scopes it himself, travels to the site and mobilizes a full-service crew from the first cut to final acceptance.

Talk to Marty